beautypg.com

Printronix MVP Series User Manual

Page 211

background image

Routine Service and Diagnostics

9–4

4.

Remove the hammer bank assembly cover as follows:

a.

Lift and hold the shuttle locking knob as far as it will go.

Metal
Strips

Black Knob

b.

Grasp the hammer bank cover assembly carefully and tilt it up from

the front, away from you.

45

°

c.

Pull the cover assembly upward so that it clears the small retaining

pins of the hammer tips; pull the cover assembly clear from the

magnets.

Metal Strips

Hammer Tips