beautypg.com

Gateway ALR 7200 User Manual

Page 42

background image

30 Maintaining and Troubleshooting the Gateway ALR 7200 Server

8.

If the processor cartridge does not already have the heatsink attached
to it, attach the heatsink according to the instructions that came with
the processor upgrade kit.

9.

Replace the lock bar on the processor support and secure it with the
two screws that you removed earlier.

10.

Set the jumpers for the new processor configuration (see the table on
page 33).

11.

Close the case, as described in “Closing the system” on page 8.

12.

Reconnect the power cord and turn on the system.

4077.boo Page 30 Thursday, January 21, 1999 9:48 AM