Solare Datensysteme Solar-Log User Manual
Page 31

31
Optional Connections
Note
We recommend checking and cleaning SIM cards once a year.
The contact points of the SIM card could start corroding due to humidity and should
be cleaned regularly to ensure trouble-free operations.
9�2 Solar-Log™ Meter (Solar-Log 300 and 1200)
The Solar-Log Meter version of the Solar-Log™ has an integrated interface to connect up to six current
transformers (CTs). This optional Meter interface makes it possible to measure generating units (produc-
tion meter) and consumption from individual appliances.
Fig.: Connection for current transformers (Solar-Log™ Meter)
The current transformers (CTs) can record the current flow (AC) of one or two phase appliances in various
combinations. The output is calculated based on a defined reference voltage or one calculated by the
Solar-Log™.
Note
For Solar-Log 300 and 200 Meter the installation direction of the current transformer
(CT) is not relevant, since the current flow direction can not be determined. It is missing
to a direct voltage measurement.
Combinations:
•
2x3 Phases
•
1x3 Phases + 3x1 Phase
•
6x1 Phase
•
3x2 Phases
•
2x2 Phases + 2x1 Phase
•
1x2 Phases + 4x1 Phase