Confi guration and Operation
8.1 Controls
The inverter has a backlit LCD as well as three status LEDs. The inverter is operated using six buttons.
1
2
3
4
5
6
7
Figure 27: Control panel
Key
1
"Operating" LED
5
4-way button
2
"Feed-in" LED
6
“OK” button
3
"Fault" LED
7
“ESC” key
4
LCD
8.1.1 LED
indicators
The three LEDs on the front of the inverter show the diff erent operating states.
The LEDs can display the following states:
LED illuminated
LED fl ashing
LED not illuminated
The LED indicators show the following operating status:
Operating status
LEDs
Display
Description
Start
The green "Operating" LED is illuminated
if an AC voltage is present,
(independently of the DC voltage).
Feed-in start
Power fed into the grid
or measured values
The green "Operating" LED is lit.
The green "Feed-in" LED is illuminated
after the country-specifi c waiting period*.
The inverter is ready to feed in, i.e. is on
the grid.
You can hear the grid relay switch on.
Feed-in operation
Power fed into the grid
or measured values
The green "Operating" LED is lit.
The green “Feed-in” LED is illuminated.
The “Feed-in” icon appears on the desk-
top.
The inverter feeds into the grid.
* The waiting period is used for network monitoring and ensures that all network parameters are in the permissi-
ble range.
For country-specifi c waiting periods, see our website at http://www.kaco-newenergy.de/.