En 5 preparation, 1 delivery, 2 unpack device – KACO Powador 30.0 - 60.0 TL3 User Manual
Page 13
Preparation
Operating Instructions for Powador 30.0-72.0 TL3_EN
Page 13
EN
5 Preparation
5.1 Delivery
Every inverter leaves our factory in proper electrical and mechanical condition. Special packaging ensures that the
units are transported safely. The shipping company is responsible for any transport damage that occurs.
5.2 Unpack
device
1
2
3
4
5
Figure 3: Unpack device/ transport device
Key
1
Cardboard box cover
4
Cover
2
Protective corners
5
Eyebolts
3
Pallet
Unpack device
1.
Loosen packaging tape from cardboard box.
2. Lift down the cardboard box cover.
3. Remove protective corners.
4. Remove the cover.
5.2.1
Scope of delivery
•
Inverter
•
Housing covers: Cover plates right and left, cover
•
Installation kit
•
Documentation
Checking your delivery
1.
Inspect your inverter thoroughly.
2. Immediately notify the shipping company in case of the following:
–
Damage to the packaging that indicates that the inverter may have been damaged
–
Obvious damage to the inverter
3. Send a damage report to the shipping company immediately.
The damage report must be received by the shipping company in writing within six days following receipt of the
inverter. We will be glad to help you if necessary.