beautypg.com

Grass Valley PRS 250 RAID Storage System User Manual

Page 72

background image

Chapter 3 Servicing the System

3-26

RAID Instructions

4. Remove the SP from the chassis as shown below.

Removing an SP

5. Install a SP filler board. See “Removing or Installing an SP Filler Board” on

page 28.

6. Immediately close and lock the fan module.

IMPORTANT

Before shipping a failed SP, remove its memory modules.

(See Removing SP Memory Modules.)

7. Remove and store the ESD wrist band.

Ejectors

SP B*

SP A

A.Pull both ejectors until they
unlock and SP starts coming
out of chassis.

B.Rest edge of SP on palm of

hand, and with other hand pull

it out of chassis, making sure

not to any touch any electronic

components or circuits.

C.Place SP component-side up
on static-free work surface.

* The SP B location is occupied by a SP Filler Board.

This manual is related to the following products: