beautypg.com

Assembly – Harken 1036 MKIII Jib Reefing & Furling User Manual

Page 39

background image

Assembly

May 2002

Unit 3 MKIII

20

In this step, the halyard swivel, feeder and torque tube are attached to the foil.

5

Norseman/Sta-Lok Instructions
After the swivel and torque tube have been placed on the wire
you must install the Norseman or Sta-Lok threaded stud. See
pages 26 and 27 for details. For easier installation, push the
bottom foil completely over the bottom connector to expose as
much wire as possible. After the terminal is attached, secure
the bottom foil as described in Step 4.

Rod Instructions

After the swivel, feeder and torque tube have been attached
per the above instructions, you must attach the rod adapter
stud to the rod. See page 27 for details.

Slip the halyard swivel onto the foil and up past the
3" (76 mm) gap in the foils.

The halyard swivel has a “top” and a “bottom” and must
be placed on the foil with the long hooked tang facing
up.

Attach the feeder to the gap in the foils. Use blue Loctite
on the screws. The end of the feeder with the screws
should be at the bottom of the gap.

Remove the two torque tube screws and slip the tube
onto the foil, narrow end up and secure it by inserting
the red stud cap against the flat side of the foil.
Alternatively, you can also use duct tape.

NORSEMAN, STA-LOK OR ROD - refer to special
instructions below before proceeding.

Tip: The feeder uses a “loose hinge.” Place the half with the pin sock-
ets into place on the exposed connector, slip the half with the pins
into the sockets and snap it shut.

Long Hooked

Tang Up