beautypg.com

Assembly – Harken 882 MKIII Jib Reefing & Furling User Manual

Page 36

background image

Assembly

January 1999

Unit 1 MKIII

18

In this step, the first main foil extrusion is slipped onto the headstay and

connected to the top foil.

3

Tip: The connector screw holes should align with the foil holes when

the foil is pushed tightly against the foil above. If the foil does not slip

onto the connector easily, check the alignment of the joint. It may be

necessary to hold the 7' (2.13 m) foil up to achieve proper alignment.

Norseman/Sta-Lok Instructions
Because the lower end of the wire is open you will simply slide
the foil onto the stay and assemble as described.

Rod Instructions
Rod installations are identical to swaged wire at this point. You
may find that the rod is difficult to lay flat and two people may
be required to hold the rod straight while foils are slipped up
the headstay. The curves in the rod may make it more difficult
to slide extrusions over the connectors. The straighter the rod
can be held, the more easily foils will pass over connectors.

Select a 7' (2.13 m) foil and slide it onto the headstay

over the threaded stud and connectors and up to the

top foil piece.

Coat the exposed half of the connector with red Loctite.

Push the foil over the connector until the holes align.

Coat connector screws with red Loctite. Insert into the

connector and tighten.

Tip: Do not force the foil over the connectors. If you feel resistence,

check the foil and connectors carefully for burrs and dirt. The best way

to see dirt or burrs is to look into the foil while pointing it towards a

light source. Be sure that the connectors at the bottom of the wire are

spaced with enough room to align properly inside the foil section.