LAARS NeoTherm NTV1000 - Install and Operating Manual User Manual
Page 55
NeoTherm Boilers and Water Heaters
Page 51
System 7 –
Single boiler, System control
Job I
Set the parameters used by the Lead/Lag system
Job L
Building automation or multiple boiler control thermostat demand
Job O
Set up the combustion on each of the burners
Job P
Set the date and time on the system
System 8 –
Single boiler, System control, Outdoor reset
Job I
Set the parameters used by the Lead/Lag system
Job L
Building automation or multiple boiler control thermostat demand
Job K
Lead/Lag outdoor reset and warm weather shutdown
Job O
Set up the combustion on each of the burners
Job P
Set the date and time on the system
System 9 –
Multiple boiler, System control, Outdoor reset
Job B
Set up the names for each of the controllers
Job C
Make one control the Lead/Lag master
Job D
On each of the controllers that will act as a slave, disable the Lead/Lag Master
Job E
Set up the Modbus control addressing to assign addresses for each of the controls
Job F
Set up the addresses for the flap valves
Job G
Disconnect the Operator Interfaces that will not be used
Job H
Connect the Modbus wiring
Job I
Set the parameters used by the Lead/Lag system
Job L
Building automation or multiple boiler control thermostat demand
Job O
Set up the combustion on each of the burners
Job P
Set the date and time on the system
System 10 –
Multiple boiler, System control, Outdoor reset
Job B
Set up the names for each of the controllers
Job C
Make one control the Lead/Lag master
Job D
On each of the controllers that will act as a slave, disable the Lead/Lag Master
Job E
Set up the Modbus control addressing to assign addresses for each of the controls
Job F
Set up the addresses for the flap valves
Job G
Disconnect the Operator Interfaces that will not be used
Job H
Connect the Modbus wiring
Job I
Set the parameters used by the Lead/Lag system
Job L
Building automation or multiple boiler control thermostat demand
Job K
Lead/Lag outdoor reset and warm weather shutdown
Job O
Set up the combustion on each of the burners
Job P
Set the date and time on the system