beautypg.com

Verification routine – Bio-Rad Bio-Plex Manager™ MP Software Upgrade User Manual

Page 87

background image

Verification Routine

User Guide

| 85

Verification Routine

Description of Routine

The Verification routine ensures that the calibration settings are valid and ensures

that well-to-well cross talk does not occur.

When to Run this Routine

Run the Verification routine when its status in the Maintenance view is not up to

date. Bio-Plex

Manager

MP adds verification to the Daily Start Up routine in

accordance with the manufacturer’s recommendation. Therefore, if you run the Daily

Start Up routine daily, you will be running the Verification routine as recommended.

Estimated Run Time

4 minutes

To Run the Verification Routine

Before you run the Verification routine, you must import the verification kit

information. For more information, see

Calibration and Verification Kits on page

66

.

1.

Navigate to the Maintenance view.

2.

In the Select Routine section, select Verification from the Additional Routines
dropdown list.

3.

Add 5 ml 70% isopropanol to the appropriate reservoir in the reagent block.

4.

Vortex VER, Fluidics1, and Fluidics2 each for 10 sec.

5.

Add 6 drops each of CAL, VER, Fluidics1, and Fluidics2 to the indicated wells.

6.

Click Start.

This manual is related to the following products: