beautypg.com

Enhanced maintenance routine – Bio-Rad Bio-Plex Manager™ MP Software Upgrade User Manual

Page 81

background image

Enhanced Maintenance Routine

User Guide

| 79

Enhanced Maintenance Routine

Description of Routine

The Enhanced Maintenance routine clears any bubbles from the system and clears

any clogs from the probe and fluidics.

When to Run this Routine

This routine is recommended when a low bead count occurs during a protocol run

or when calibration or verification fails.

Estimated Run Time

14 minutes

Before Running the Routine

Before you run the Enhanced Maintenance Routine, Bio-Rad recommends that you

check the following:

1.

Check that the correct calibration and control lots are being used.

2.

Clean the sample probe.

3.

Check that the waste container is not full.

4.

Run the Adjust Probe Height procedure.

To Run the Enhanced Maintenance Routine

1.

Navigate to the Maintenance view.

2.

In the Select Routine section, select Enhanced Maintenance.

3.

Add 5 ml distilled or deionized water, 5 ml 70% isopropanol, and 5 ml 0.1N
NaOH to the appropriate reservoirs in the reagent block.

4.

Click Start.

This manual is related to the following products: