beautypg.com

Prepare for storage routine – Bio-Rad Bio-Plex Manager™ MP Software Upgrade User Manual

Page 83

background image

Prepare for Storage Routine

User Guide

| 81

Prepare for Storage Routine

Description of Routine

The Prepare for Storage routine clears all fluids from the instrument.

When to Run this Routine

Run the Prepare for Storage routine if you will not be using the instrument for more

than two weeks or before you ship the instrument to Bio-Rad.

Estimated Run Time

6 minutes

To Run the Prepare for Storage Routine

1.

Navigate to the Maintenance view.

2.

In the Select Routine section, select Prepare for Storage from the Additional
Routines dropdown list.

3.

Add 5 ml distilled or deionized water, 5 ml 0.1N NaOH, and 5 ml 10% bleach to
the appropriate reservoirs in the reagent block.

4.

Click Start.

This manual is related to the following products: