Testing the sensor wiring, Wiring the tekmarnet, Devices tn4 boiler bus b – tekmar 284 Boiler Control User Manual
Page 30: Tn4 boiler bus 1, Tn4 boiler bus 2, Tn4 boiler bus 3

© 2014
284_D - 08/14
30 of 60
A Watts Water Technologies Company
Temperature
Resistance
Temperature
Resistance
Temperature
Resistance
Temperature
Resistance
°F
°C
°F
°C
°F
°C
°F
°C
-50
-46
490,813
20
-7
46,218
90
32
7,334
160
71
1,689
-45
-43
405,710
25
-4
39,913
95
35
6,532
165
74
1,538
-40
-40
336,606
30
-1
34,558
100
38
5,828
170
77
1,403
-35
-37
280,279
35
2
29,996
105
41
5,210
175
79
1,281
-30
-34
234,196
40
4
26,099
110
43
4,665
180
82
1,172
-25
-32
196,358
45
7
22,763
115
46
4,184
185
85
1,073
-20
-29
165,180
50
10
19,900
120
49
3,760
190
88
983
-15
-26
139,403
55
13
17,436
125
52
3,383
195
91
903
-10
-23
118,018
60
16
15,311
130
54
3,050
200
93
829
-5
-21
100,221
65
18
13,474
135
57
2,754
205
96
763
0
-18
85,362
70
21
11,883
140
60
2,490
210
99
703
5
-15
72,918
75
24
10,501
145
63
2,255
215
102
648
10
-12
62,465
80
27
9,299
150
66
2,045
220
104
598
15
-9
53,658
85
29
8,250
155
68
1,857
225
107
553
Testing the Sensor Wiring
A good quality test meter capable of measuring up to 5,000 kΩ
(1 kΩ = 1000 Ω) is required to measure the sensor resistance. In
addition to this, the actual temperature must be measured with
either a good quality digital thermometer, or if a thermometer
is not available, a second sensor can be placed alongside the
one to be tested & the readings compared.
First measure the temperature using the thermometer & then
measure the resistance of the sensor at the control. The wires
from the sensor must not be connected to the control while the
test is performed. Using the chart below, estimate the temperature
measured by the sensor. The sensor & thermometer readings
should be close. If the test meter reads a very high resistance,
there may be a broken wire, a poor wiring connection or a
defective sensor. If the resistance is very low, the wiring may
be shorted, there may be moisture in the sensor or the sensor
may be defective. To test for a defective sensor, measure the
resistance directly at the sensor location.
Do not apply voltage to a sensor at any time as damage
to the sensor may result.
Wiring the tekmarNet
®
Devices
tN4 Boiler Bus b
Terminals 32 - 33
Terminals 32 & 33 provide communication for tN4 devices on the tN4 Boiler Bus b. Connect terminals 32 (tN4) & 33 (C0) to the
corresponding terminals on the tN4 devices that are to be connected.
The connection is polarity sensitive. Ensure that terminal 32 (tN4) is connected to the tN4 terminal on the tN4 device &
that terminal 33 (C0) is connected to the C terminal on the tN4 device.
tN4 Boiler Bus 1
Terminals 34 - 35
Terminals 34 & 35 provide communication for tN4 devices on the tN4 Boiler Bus 1. Connect terminals 34 (tN4) & 35 (C1) to the
corresponding terminals on the tN4 devices that are to be connected.
The connection is polarity sensitive. Ensure that terminal 34 (tN4) is connected to the tN4 terminal on the tN4 device &
that terminal 35 (C1) is connected to the C terminal on the tN4 device.
tN4 Boiler Bus 2
Terminals 36 - 37
Terminals 36 & 37 provide communication for tN4 devices on the tN4 Boiler Bus 2. Connect terminals 36 (tN4) & 37 (C2) to the
corresponding terminals on the tN4 devices that are to be connected.
The connection is polarity sensitive. Ensure that terminal 36 (tN4) is connected to the tN4 terminal on the tN4 device &
that terminal 37 (C2) is connected to the C terminal on the tN4 device.
tN4 Boiler Bus 3
Terminals 38 - 39
Terminals 38 & 39 provide communication for tN4 devices on the tN4 Boiler Bus 3. Connect terminals 38 (tN4) & 39 (C3) to the
corresponding terminals on the tN4 devices that are to be connected.
The connection is polarity sensitive. Ensure that terminal 38 (tN4) is connected to the tN4 terminal on the tN4 device &
that terminal 39 (C3) is connected to the C terminal on the tN4 device.