The tekmar Boiler Control 268 can control the supply water temperature from up to 9 on / off stages based on outdoor temperature,
control for Domestic Hot Water (DHW) generation, a setpoint requirement or optionally an external input signal (0 - 10 V (dc)). A large
easy to read display provides current system temperatures and operating status. The control has outputs for a primary pump and
either a combustion air damper or alert. Based on the mode of operation selected, the control can operate different combinations of
boiler stages and boiler pumps.

Additional functions include:

DHW demand for DHW loads

Setpoint demand for setpoint loads

Test sequence to ensure proper component operation

CSA C US certified

Setback input for energy savings

0 - 10 V (dc) input signal

Input

Universal Sensor

Included

Input

Universal Sensor

Included

Input

Outdoor

Sensor

Included

Input

Timer or Switch

Optional

Input

Setpoint / DHW

Demand

Input

115 V (ac)

Power Supply

Input

Boiler

Demand

Output

Primary

Pump

Output

Combustion Air

Or Alert

Output
Boiler

Output
Pump

Or

Or

Output
Boiler

Output
DHW Pump Or
DHW Valve

Or

2

1

Com

Sup Ret

Sw

Dem Dem DHW N

+

L

P1

1

1

2

2

3

3

4

4

5

5

6

6

7

7

8

8

3

Boil Boil Out UnO

Boil Com Setp/

Prim

4 5

6 7 8 9

10 11

12 13 14 15 16 17 18 19 20 21 22 23 24 25 26

28

27

29 30 31

Boiler Control 268

Nine Stage Boiler & DHW / Setpoint

Do not apply power

Signal wiring must be rated at least 300 V.

H2026C

Alert

DHW

C.A. /

Power

Relay

Relay

Relay

Relay

Relay

Relay

Relay

Relay

Relay 9/

Rotate

Alert

Off

Fixed Last

Off

Exercise

Adv

External Input

Stand Alone

Installer

C.A.

First On / Last Off

Fixed Lead

First On / First Off

Menu

Item

Boiler Demand

DHW / Setpoint Demand

WWSD

External Input Signal

Offset

Modes
1 Up to 9 On/Off Boilers
2 Up to 4 On/Off Boilers & 4 Pumps
3 Up to 4 Lo/Hi Boilers
4 Up to 3 Lo/Hi Boilers & 3 Pumps
5 Up to 3 Three Stage Boilers
6 Up to 2 Three Stage Boilers & 2 Pumps
7 Up to 2 Four Stage Boilers
8 1 Four Stage Boiler & 1 Pump

Test

off

not testing

red

testing

red

testing paused

For maximum
heat, press &
hold Test for 3
seconds.

943-01

Made in Canada by

tekmar Control Systems Ltd.

Power

115 V ±10% 50/60 Hz 600 VA

Relays

230 V (ac) 5 A 1/3 hp

Demands

20 to 260 V (ac) 2 VA

Dat

e Code

C

US

Input

0-10 V (dc)

External Signal

Or

Meets Class B:
Canadian ICES
FCC Part 15

M

Priority Override

Installer and Advanced access levels

Primary pump output

Individual boiler pump outputs (in applicable modes)

• Pump

exercising

Pump purging (primary and boiler)

Boiler demand for space heating loads

Note:
Boiler, DHW, or
setpoint demand
must be powered
with 20 to 260 V (ac)
before the boiler is
able to fire.