beautypg.com

Install the batterypack option (ubpo) kit, N o t e – ETC Unison ERn Wall-mount Control Enclosure User Manual

Page 33

background image

5

Install Rack Options

29

Install the BatteryPack Option (UBPO) Kit

Step 1:

The BatteryPack Option board is provided with a wiring harness for connection

between the BatteryPack and the right I/O board. Install the Unison BatteryPack

Option cable harness and connector into the ERn enclosure.

N o t e :

An ERn enclosure supports the use of either the Unison RideThru Option (URTO)

or the Unison BatteryPack Option (UBPO), but not both in the same enclosure.

N o t e :

The BatteryPack Option kit is intended for use only in wall mount ERn enclosures

and is not compatible with rack mounted enclosures.

The BatteryPack Option (UBPO) kit provides battery

power during power outages to the Paradigm

Architectural Control Processor for up to 90 minutes (ERn

with a single P-ACP) or up to 45 minutes (ERn4 with two

Paradigm ACPs). The self-contained battery installs on

the bottom of the ERn enclosure.

ERn after UBPO cable and

connector installation

a: Insert the connector end through the opening in the

bottom of the ERn enclosure. The connector is designed

to snap into place without additional hardware, slight

force may be required to ensure the connector installs

properly.

b: Connect the two pin connector to the appropriate

receptacle labeled “Ride Thru / Batt” on the

ERn right I/O board.

See “Connect ERn Right I/O Data

Terminations” on page 18.