CU Electrical Installation
Putting in operation
Keep the
disconnected from the mains.
CU
Loosen the three screws on the upper cover of the CU.
Move the upper cover of the
in such a way that you can remove it.
CU
When removing the cover, proceed with caution, be careful about the earth wire
connecting the cover with the
bottom part. Do not disconnect the wire unless
CU
there is a reason to do so!
Using the slide-on terminals supplied with the device, connect the Audio Units,
splitters (if there are 2 and more lift shafts) and other components of the system
with the
Adhere to polarity!
CU.
Install a PSTN, GSM or UMTS module unless installed on the
. Abide by the
CU
instructions given in the Instructions for Use of the given module (refer to Subs.
2.7 or 2.8).
Connect an analogue telephone line to the PSTN module if used (use a telephone
connector or the terminal board on the module). Do not forget to connect an
antenna to the GSM/UMTS module is used and insert a SIM card!
Connect the rechargeable battery jumper link (see the next subsection –
Rechargeable Battery State Check) to activate the rechargeable battery function.
Replace the upper cover on the
and tighten the cover fitting screws. Doing so
CU
make sure that the earthing wire is connected to the cover!
Connect the
power cable to a 230V socket.
CU
Power supply
The
is powered by 100–240V mains power.
CU
Rechargeable Battery Connection and State Check
Procedure:
Keep the
disconnected from the mains.
CU
Loosen the three screws on the upper cover of the CU.
Move the upper cover of the
in such a way that you can remove it.
CU
When removing the cover, proceed with caution, be careful about the earth wire
connecting the cover with the
bottom part. Do not disconnect the wire unless
CU
there is a reason to do so!
Interconnect the rechargeable batteries and connect them with the motherboard
using a FASTON cable (see the figure below). Mind the polarity.
Caution
If you connect one lift shaft only, it is not necessary to connect the
splitters. Use the splitters only if you want to connect 2 or more lift shafts.
Warning
Never connect an AC source or unstabilised DC source to avoid CU
damage.