beautypg.com

Bryant Bruant 4 Way Gas 355AAV User Manual

Page 60

background image

60

CHECKLIST — DIRECT VENT (1---PIPE) INSTALLATION

LOAD CALCULATION

________________

Heating Load (Btuh)

Condensate Drain

________________

Cooling Load (Btuh)

________________

Unit Level or Pitched Forward

________________

Furnace Model Selection

________________

Internal Tubing Connections

Free of Kinks and Traps

VENT PIPING

________________

External Drain Connection Leak

Tight and Sloped

Termination Location

________________

Condensate Trap Primed before

Start---Up

________________

Roof or Sidewall

Heat Tape Installed if Required

________________

Vent Pipe Length

CHECKLIST --- START---UP

________________

Vent Pipe Elbow Quantity

________________

Gas Input Rate (Set Within 2

percent of Rating Plate)

________________

Pipe Diameter Determined from

Sizing Table

________________

Temperature Rise Adjusted

________________

Pipe Sloped to Furnace

Thermostat Anticipator

Pipe Insulation

________________

Anticipator Setting Adjusted or

________________

Over Ceilings

________________

Cycle Rate (3 Cycles per Hr)

Selected

________________

Low---Ambient Exposed Pipes

Safety Controls Check Operation

________________

Primary Limit

________________

Pressure Switches

Manufacturer reserves the right to discontinue, or change at any time, specifications or designs without notice and without incurring obligations.

E

2008 Bryant Heating & Cooling Systems D 7310 W. Morris St. D Indianapolis, IN 46231

Printed in U.S.A.

Edition Date: 12/08

Replaces: II355A--- 40--- 3

Catalog No. II355A---40---4

355A