Bryant Bruant 4 Way Gas 355AAV User Manual
Page 60
![background image](/manuals/52629/60/background.png)
60
CHECKLIST — DIRECT VENT (1---PIPE) INSTALLATION
LOAD CALCULATION
________________
Heating Load (Btuh)
Condensate Drain
________________
Cooling Load (Btuh)
________________
Unit Level or Pitched Forward
________________
Furnace Model Selection
________________
Internal Tubing Connections
Free of Kinks and Traps
VENT PIPING
________________
External Drain Connection Leak
Tight and Sloped
Termination Location
________________
Condensate Trap Primed before
Start---Up
________________
Roof or Sidewall
Heat Tape Installed if Required
________________
Vent Pipe Length
CHECKLIST --- START---UP
________________
Vent Pipe Elbow Quantity
________________
Gas Input Rate (Set Within 2
percent of Rating Plate)
________________
Pipe Diameter Determined from
Sizing Table
________________
Temperature Rise Adjusted
________________
Pipe Sloped to Furnace
Thermostat Anticipator
Pipe Insulation
________________
Anticipator Setting Adjusted or
________________
Over Ceilings
________________
Cycle Rate (3 Cycles per Hr)
Selected
________________
Low---Ambient Exposed Pipes
Safety Controls Check Operation
________________
Primary Limit
________________
Pressure Switches
Manufacturer reserves the right to discontinue, or change at any time, specifications or designs without notice and without incurring obligations.
E
2008 Bryant Heating & Cooling Systems D 7310 W. Morris St. D Indianapolis, IN 46231
Printed in U.S.A.
Edition Date: 12/08
Replaces: II355A--- 40--- 3
Catalog No. II355A---40---4
355A