beautypg.com

Bryant 345MAV User Manual

Installation, start-up, and operating instructions, 345mav series b

background image

NOTE:

Read the entire instruction manual before starting the

installation.
Index

Page

DIMENSIONAL DRAWING........................................................2
SAFETY CONSIDERATIONS .....................................................3

Clearances to Combustibles......................................................3

ELECTROSTATIC DISCHARGE (ESD) PRECAUTIONS ....3-4
INTRODUCTION ..........................................................................4
APPLICATIONS ......................................................................4-11

General ......................................................................................4
Upflow Applications..............................................................4-7
Downflow Applications.........................................................7-8
Horizontal Left (Supply-Air Discharge) Applications .........8-9
Horizontal Right (Supply-Air Discharge) Applications .....9-11

LOCATION ............................................................................11-12

General...............................................................................11-12
Furnace Location Relative to Cooling Equipment ................12
Hazardous Locations...............................................................12

AIR FOR COMBUSTION AND VENTILATION ...............13-14

General ....................................................................................13
Unconfined Space ...................................................................13
Confined Space..................................................................13-14

INSTALLATION....................................................................14-17

Leveling Legs (If Desired)................................................14-15
Installation On a Concrete Slab .............................................15
Installation On a Combustible Floor (Downflow

Applications) ................................................................15-16

Installation In Horizontal Applications ..................................16
Filter Arrangement..................................................................17
Bottom Closure Panel.............................................................17
Gas Piping...............................................................................18

ELECTRICAL CONNECTIONS...........................................18-21

115-v Wiring......................................................................18-19
24-v Wiring........................................................................19-21
Accessories..............................................................................21

VENTING ...............................................................................21-28

Removal of Existing Furnaces from

Common Vent Systems.....................................................22

Combustion-Air and Vent Piping .....................................22-28
Vent Termination ....................................................................28
Multiventing ............................................................................28

CONDENSATE DRAIN ........................................................28-29

General...............................................................................28-29
Application ..............................................................................29

Condensate Drain Protection ..................................................29

SEQUENCE OF OPERATION..............................................30-31

Heating Mode..........................................................................30
Cooling Mode.............30 Continuous Blower Mode.............30
Heat Pump Mode ....................................................................30
Component Test ......................................................................31

START-UP PROCEDURES ..................................................31-37

General ....................................................................................31
Prime Condensate Trap With Water.................................31-32
Purge Gas Lines......................................................................32
Adjustments .......................................................................32-37
Set Gas Input Rate ............................................................32-36
Set Temperature Rise ........................................................36-37
Blower Off Delay (Heat Mode) .............................................37
Set Thermostat Heat Anticipator............................................37

CHECK SAFETY CONTROLS..................................................37

Check Primary Limit Control.................................................37
Check Pressure Switch ...........................................................37

CHECKLIST...........................................................................37-38

A93040

®

ama

CANADIAN GAS ASSOCIATION

A PP R O VED

R

As an ENERGY STAR
Partner, BRYANT Heat-
ing & Cooling Systems
Company has determined
that this product meets the
ENERGY STAR guide-
lines for energy efficiency.

REGISTERED QUALITY SYSTEM

Fig. 1—Multipoise Orientations

A93041

UPFLOW

DOWNFLOW

HORIZONTAL

LEFT

AIRFLOW

AIRFLOW

AIRFLOW

AIRFLOW

HORIZONTAL

RIGHT

installation, start-up,
and operating instructions

4-WAY MULTIPOISE
FIXED-CAPACITY
CONDENSING GAS FURNACE

Cancels:

II 345M-40-1

II 345M-40-2

6-98

345MAV

Series B

—1—