beautypg.com

Bryant 345MAV User Manual

345mav series f, Installation, start-up, and operating instructions

background image

NOTE:

Read the entire instruction manual before starting the

installation.

This symbol

indicates a change since the last issue.

Table of Contents

Page

DIMENSIONAL DRAWING........................................................2
SAFETY CONSIDERATIONS .....................................................3

Clearances to Combustibles......................................................3

CODES AND STANDARDS........................................................4
ELECTROSTATIC DISCHARGE (ESD) PRECAUTIONS........5
INTRODUCTION ..........................................................................5
APPLICATIONS............................................................................5

General ......................................................................................5
Upflow Applications.................................................................6
Downflow Applications ............................................................7
Horizontal Left (Supply-Air Discharge) Applications ............9
Horizontal Right (Supply-Air Discharge) Applications ........11

LOCATION..................................................................................12

General ....................................................................................12
Furnace Location Relative to Cooling Equipment ................13
Hazardous Locations...............................................................13

AIR FOR COMBUSTION AND VENTILATION ....................13

General ....................................................................................13
Unconfined Space ...................................................................14
Confined Space .......................................................................14

INSTALLATION .........................................................................15

Leveling Legs (If Desired) .....................................................15
Installation In Upflow or Downflow Applications................17
Installation In Horizontal Applications ..................................17
Air Ducts.................................................................................17

General Requirements .......................................................17
Ductwork Acoustical Treatment .......................................17
Supply Air Connections ....................................................17
Return Air Connections.....................................................18
Filter Arrangement ............................................................18
Bottom Closure Panel........................................................19
Gas Piping..........................................................................19

Electrical Connections ............................................................20

115-v Wiring......................................................................21
24-v Wiring........................................................................21
Accessories ........................................................................22

Venting ....................................................................................22

Removal of Existing Furnaces from Common
Vent Systems .....................................................................22
Combustion-Air and Vent Piping .....................................23
Vent Termination...............................................................31
Multiventing.......................................................................31

Condensate Drain....................................................................31

General...............................................................................31
Application.........................................................................33
Condensate Drain Protection.............................................33

START-UP, ADJUSTMENTS AND
SAFETY CHECK...................................................................33

General...............................................................................33
Prime Condensate Trap With Water.................................34
Purge Gas Lines ................................................................34
Sequence of Operation ......................................................34

Heating Mode...............................................................34
Cooling Mode...............................................................35
Continuous Blower Mode ............................................35
Heat Pump Mode .........................................................35
Component Test ...........................................................35

Adjustments .......................................................................36

Set Gas Input Rate .......................................................36
Set Temperature Rise...................................................40
Blower Off Delay (Heat Mode) ..................................41
Set Thermostat Heat Anticipator .................................41

Check Safety Controls.......................................................41

Check Primary Limit Control ......................................41

A93040

Fig. 1—Multipoise Orientations

A93041

UPFLOW

DOWNFLOW

HORIZONTAL

LEFT

AIRFLOW

AIRFLOW

AIRFLOW

AIRFLOW

HORIZONTAL

RIGHT

ama

CERTIFIED

As an ENERGY STAR® Part-
ner, BRYANT Heating & Cool-
ing Systems Company has de-
termined that this product meets
the ENERGY STAR® guide-
lines for energy efficiency.

REGISTERED QUALITY SYSTEM

installation, start-up,
and operating instructions

4-WAY MULTIPOISE
FIXED-CAPACITY
CONDENSING GAS FURNACE

Cancels:

II 345M-40-7

II 345M-40-8

12-03

345MAV

Series F

—1—