CHECKLIST — DIRECT VENT (2---PIPE) INSTALLATION

LOAD CALCULATION

________________

Heating Load (Btuh)

Condensate Drain

________________

Cooling Load (Btuh)

________________

Unit Level or Pitched Forward

________________

Furnace Model Selection

________________

Internal Tubing Connections

Free of Kinks and Traps

COMBUSTION AND VENT PIPING

________________

External Drain Connection Leak

Tight and Sloped

Termination Location

________________

Condensate Trap Primed before

Start---Up

________________

Roof or Sidewall

Heat Tape Installed if Required

________________

Termination Kit --- 2 Pipe or Con-

centric

CHECKLIST --- START---UP

________________

Combustion---Air Pipe Length

________________

Gas Input Rate (Set Within 2

percent of Rating Plate)

________________

Combustion---Air Pipe Elbow

Quantity

________________

Temperature Rise Adjusted

________________

Vent Pipe Length

Thermostat Anticipator

________________

Vent Pipe Elbow Quantity

________________

Anticipator Setting Adjusted or

________________

Pipe Diameter Determined from

Sizing Table

________________

Cycle Rate (3 Cycles per Hr)

Selected

________________

Pipe Sloped To Furnace

Safety Controls Check Operation

Pipe Insulation

CHECKLIST --- START---UP

________________

Over Ceilings

________________

Gas Input Rate (Set Within 2

percent of Rating Plate)

________________

Low---Ambient Exposed Pipes

________________

Temperature Rise Adjusted

Thermostat Anticipator

________________

Anticipator Setting Adjusted or

________________

Cycle Rate (3 Cycles per Hr)

Selected

Safety Controls Check Operation

________________

Primary Limit

________________

Pressure Switches

355A