CHECKLIST — DIRECT VENT (2---PIPE) INSTALLATION
LOAD CALCULATION
________________
Heating Load (Btuh)
Condensate Drain
________________
Cooling Load (Btuh)
________________
Unit Level or Pitched Forward
________________
Furnace Model Selection
________________
Internal Tubing Connections
Free of Kinks and Traps
COMBUSTION AND VENT PIPING
________________
External Drain Connection Leak
Tight and Sloped
Termination Location
________________
Condensate Trap Primed before
Start---Up
________________
Roof or Sidewall
Heat Tape Installed if Required
________________
Termination Kit --- 2 Pipe or Con-
centric
CHECKLIST --- START---UP
________________
Combustion---Air Pipe Length
________________
Gas Input Rate (Set Within 2
percent of Rating Plate)
________________
Combustion---Air Pipe Elbow
Quantity
________________
Temperature Rise Adjusted
________________
Vent Pipe Length
Thermostat Anticipator
________________
Vent Pipe Elbow Quantity
________________
Anticipator Setting Adjusted or
________________
Pipe Diameter Determined from
Sizing Table
________________
Cycle Rate (3 Cycles per Hr)
Selected
________________
Pipe Sloped To Furnace
Safety Controls Check Operation
Pipe Insulation
CHECKLIST --- START---UP
________________
Over Ceilings
________________
Gas Input Rate (Set Within 2
percent of Rating Plate)
________________
Low---Ambient Exposed Pipes
________________
Temperature Rise Adjusted
Thermostat Anticipator
________________
Anticipator Setting Adjusted or
________________
Cycle Rate (3 Cycles per Hr)
Selected
Safety Controls Check Operation
________________
Primary Limit
________________
Pressure Switches
355A