Report on completed mass control processes – RADWAG BALANCES 3Y SERIES User Manual
Page 165
- 165 -
−
Product
−
Start date
−
End date
−
Batch no.
−
Standard quantity
−
Nominal mass
−
Threshold T2-
−
Threshold T1-
−
Threshold T1+
−
Threshold T2+
−
Measurements
−
Quantity of errors T2-
−
Quantity of errors T1-
−
Quantity of errors T1+
−
Quantity of errors T2+
−
Average
−
Average [%]
−
Standard deviation
−
Standard deviation
−
Standard deviation [%]
−
Empty line
−
Dashes
−
Signature
−
Non-standard printout
28.5. Report on completed mass control processes
On completing any type of mass control process a report is generated. The report is saved
in the database <
Mass controls >.
The files are named by their date and time (hour) of
process completion.