HP Insight Management-Software User Manual
Page 140
4.
In the boot target configurations table, change all the target LUN fields to be within the allowed
ranges (either a three-digit decimal between 0–255, or a 16-digit hexadecimal between 0
and FFFFFFFFFFFFFFFF).
5.
Click OK.
6.
Monitor the job progress until it is complete.
After the operation completes, you can perform move, assign, and failover operations with the
server profile.
VC Domain Maintenance operation fails when moving Ethernet networks
(VLANs tagged) from a deleted shared uplink set to another
When managing VC Domains with a firmware version later than 2.1x, if you enable VC Domain
Maintenance and delete a shared uplink set, and then add one or more Ethernet networks (VLANs
tagged) with the same name of the deleted ones to another existing shared uplink set, the VC
Domain Maintenance server profile job completes, but other VC Domain Group members might
be changed to "Mismatch Configuration" status. When trying to resynchronize such mismatched
VC Domains, the VC Domain Maintenance job fails and the following message appears in the job
details:
"Virtual Connect Manager cannot perform the requested operation. Possible
reason is the user deleted a shared uplink set and its Ethernet Networks
(VLANs tagged), then added one or more Ethernet Networks (VLANs tagged)
with the same name of the deleted ones to another existing Shared Uplink
Set."
To resolve this issue:
1.
Click the VC domains tab, and select the VC Domain where the changes were made during
the VC Domain Maintenance operation.
2.
Click VC Domain Maintenance, and enable VC Domain Maintenance again by clicking Make
changes via VC Manager.
3.
In the Virtual Connect Manager user interface, delete the Ethernet networks (VLANs tagged)
that were moved from the deleted shared uplink set to another shared uplink set.
4.
Go back to VCEM, and complete VC Domain Maintenance by clicking Complete VC Domain
Maintenance.
5.
Click the VC Domains tab, for each VC Domain with "Configuration Mismatch" status, click
VC Domain Maintenance. To confirm the resynchronization of the selected VC Domain with
the VC Domain Group configuration, click OK.
6.
Repeat steps 1 and 2 for the VC Domain where the changes were made.
7.
In the Virtual Connect Manager user interface, create the Ethernet networks (VLANs tagged)
in the desired shared uplink set.
8.
Go back to VCEM and complete VC Domain Maintenance by clicking Complete VC Domain
Maintenance.
140 Troubleshooting VCEM