KROHNE TIDALFLUX IFM 4110 PF EN User Manual
Page 2
7.30830.32.00
2
Contents
Product liability and warranty
System description
Available version
Items included with supply
CE / EMC / Standards / Certification
part A System installation and start-up
1 Installation of the primary head
1.1
Selecting the installation location
1.2
Grounding rings
1.3
Torques
1.4
Grounding IFS 4000 PF
1.5
Electrical connections of primary head
1.5.1
Connection to power
1.5.2
Data interface between primary head and signal converter
1.5.3
Electrode cable
1.5.4
Field current cable
1.5.5
Cable lengths: max. allowed distance between primary head and signal converter
1.5.6
Connection diagram IFC 110 PF with IFS 4000 PF
2 Installation of the signal converter
2.1
Please note the following information concerning installation and operation of the IFC 110 PF
2.2
Choice of installation location
2.3
Connection to power
2.4
Connection between IFC 110 PF and IFS 4000 PF
2.5
Outputs and inputs
2.5.1
Important information for outputs and inputs
2.5.2
Current output I
2.5.3
Pulse outputs P and A1
2.5.3.1 Pulse output P for electronic totalizers
2.5.3.2 Pulse output A1 for electromechanical totalizers
2.5.4
Status outputs A1 / A2 / D1 / D2
2.5.5
Control inputs C1 and C2
2.5.6
Connection diagrams of outputs and inputs
2.5.7
Standard factory settings
3 Start-up
Part B Signal converter IFC 110 PF
4 Operating the signal converter
4.1
Krohne operating concept
4.2
Operating and control elements
4.3
Key functions
4.4
Table of settable functions
4.5
Error messages in measuring mode
4.6
Resetting the totalizer and deleting error messages, RESET/QUIT menu
5
Description of functions
5.1
Full-scale range Q
100%
5.2
Time constant