Franklin Fueling Systems TS 550 evo Fuel Management System Operators Guide User Manual
Page 27

23
Line Test Results
Pass – A passing result ensures that the line is free of
leaks; any variation in product stability is within permissible
thresholds.
Fail – Test failure will be indicated by an alarm light and/or
annunciator. Additionally, a report may print (if the console
is programmed to do so, see the TS-550 evo Programming
Guide p/n 000-2173).
Abort – There may not be an indication of an abort for
some tests. If a line is disabled manually or automatically
by another application, a test is manually initiated in the
middle of a cycle or a dispense occurs, then the test cycle
will abort the results for the current test.
Incomplete – If there aren’t at least two hours of inactivity
before a precision test, it may result in an incomplete test.
Pump Shutdown – Failing the maximum number of tests
consecutively will shut the pump down. A single catch
pressure test failure or pressure up test failure will also
shut the pump down.
Note: All conditions must be physically corrected to clear
alarm conditions. To clear alarms after correcting the
problem, go to lines / control and click reset alarm. Alarms
will clear automatically when conditions permit.
Line Leak Test Reports
Reports that contain leak testing data and results may be
printed from the console or generated/printed using TSA.
Printing Tank Leak Test Reports
LCD
1. Starting at the Home Screen, Open the Quick Jump Menu.
2. Select Reports.
3. From the Report Type menu select either Lines Gross,
Lines Monthly, or Lines Annual.
4. Select the desired line or all lines.
5. Select a date range.
6. Select a report delivery method (print, email, or fax) to
generate the report.
Example Line Leak Test Reports from Internal Printer
Site ID 1
Site ID 2
Site ID 3
Site ID 4
Site ID 5
Date Time
Line Leak Report
Specified Time Frame
‘TYPE’ TEST
Line #
‘Type’ Leak Test ‘Result’
Date Time
…..
Site ID 1
Site ID 2
Site ID 3
Site ID 4
Site ID 5
Last Available
Line Leak Report
Date Time
GROSS TEST
Name
Result
Test Date
Line # Daily Total = #
Gross Leak Test ‘Result’
Date Time
MONTHLY TEST
Name
Result
Test Date
Line # Daily Total = #
Monthly Leak Test ‘Result’
Date Time
ANNUAL TEST
Name
Result
Test Date
Line # Daily Total = #
Annual Leak Test ‘Result’
Date Time
Example Line Leak External Test
Reports from Web Browser Interface