Line Test Results

Pass – A passing result ensures that the line is free of 

leaks; any variation in product stability is within permissible 

thresholds.
Fail – Test failure will be indicated by an alarm light and/or 

annunciator. Additionally, a report may print (if the console 

is programmed to do so, see the TS-550 evo Programming

Guide p/n 000-2173).
Abort – There may not be an indication of an abort for 

some tests. If a line is disabled manually or automatically 

by another application, a test is manually initiated in the 

middle of a cycle or a dispense occurs, then the test cycle 

will abort the results for the current test.
Incomplete – If there aren’t at least two hours of inactivity 

before a precision test, it may result in an incomplete test.
Pump Shutdown – Failing the maximum number of tests 

consecutively will shut the pump down. A single catch 

pressure test failure or pressure up test failure will also 

shut the pump down.

Note: All conditions must be physically corrected to clear 

alarm conditions. To clear alarms after correcting the 

problem, go to lines / control and click reset alarm.  Alarms 

will clear automatically when conditions permit.

Line Leak Test Reports

Reports that contain leak testing data and results may be 

printed from the console or generated/printed using TSA.
Printing Tank Leak Test Reports

LCD
1.  Starting at the Home Screen, Open the Quick Jump Menu.
2.  Select Reports.

3.  From the Report Type menu select either Lines Gross, 

Lines Monthly, or Lines Annual.

4.  Select the desired line or all lines.
5.  Select a date range.
6.  Select a report delivery method (print, email, or fax) to 

generate the report.

Example Line Leak Test Reports from Internal Printer

Site ID 1
Site ID 2
Site ID 3
Site ID 4
Site ID 5
Date Time

Line Leak Report
Specified Time Frame

TYPE’ TEST

Line #
Type’ Leak Test ‘Result
Date Time
…..

Site ID 1
Site ID 2
Site ID 3
Site ID 4
Site ID 5

Last Available

Line Leak Report

Date Time

GROSS TEST

Name

Result

Test Date

Line #                         Daily Total = #

Gross Leak Test ‘Result

Date Time

MONTHLY TEST

Name

Result

Test Date

Line #                         Daily Total = #

Monthly Leak Test ‘Result

Date Time

ANNUAL TEST

Name

Result

Test Date

Line #                         Daily Total = #

Annual Leak Test ‘Result

Date Time

Example Line Leak External Test

Reports from Web Browser Interface