Installation and operation, Installation overview, Mounting the ipl t sfi244 interface – Extron Electronics IPL T SFI244 User Manual
Page 9: Ul guidelines for rack mounting

Installation and
Operation
This section describes the installation and the operation of the IPL T SFI244. Topics that
are covered include:
•
•
Mounting the IPL T SFI244 Interface
•
Rear Panel Features and Cabling
•
Installation Overview
To install and set up the IPL T SFI244:
1.
Turn all of the equipment off. Make sure that the video sources (DSS, cable boxes, or
other devices), the IPL T SFI244 unit, the output devices (monitors, VCRs, projectors,
and so on) and the serial controller are all turned off and disconnected from the
power source.
2.
Mounting the IPL T SFI244 Interface
).
3.
4.
Connect power cords and turn on the devices in the following order: output devices
(projectors, monitors, speakers), the IPL T SFI244 unit, a serial controller or PC, then all
input devices (DSS, cable boxes, and so on).
5.
Configure the IPL T SFI244 interface through Telnet, then access the IPL T SFI244 using
an Internet browser.
Mounting the IPL T SFI244 Interface
UL Guidelines for Rack Mounting
The following Underwriters Laboratories (UL) guidelines pertain to the installation of an
IPL T SFI244 unit onto a rack.
1.
Elevated operating ambient — If installed in a closed or multi-unit rack assembly,
the operating ambient temperature of the rack environment may be greater than
room ambient. Therefore, consider installing the equipment in an environment
compatible with the maximum ambient temperature specified by the manufacturer
[Tma = +32 to +122 °F (0 to +50 °C)].
2.
Reduced air flow — Installation of the equipment in a rack should be such that the
amount of air flow required for safe operation of the equipment is not compromised.
3.
Mechanical loading — Mounting of the equipment in the rack should be such that a
hazardous condition is not achieved due to uneven mechanical loading.
IPL T SFI244 • Installation and Operation
3