Starting up – M&C TechGroup SP2000-H320_S2 Operator's manual User Manual
Page 24

24
Gas sampling and gas conditioning technology
2-1.1.4-ME
C A U T I O N !
In case you should not have used all cable glands when connect-
ing the temperature controller, it is important to shut the cable
glands in order to provide the tightness of the housing.
14
STARTING UP
Before starting up, check whether the supply voltage corresponds to the indication on the type
plate.
Control whether the eventually integrated ball valve is connected. The turning handle of the
hand operated ball valve must be in position on the right limit stop.
Switch on the power supply.
Control the set value on the integrated thermostat or on the external regulator. (see 14.1).
The total heating time is approx. 2 h. After approx. 1 h the probe is heated up so far that the
temperature has exceeded the below temperature alarm (30°C below set value).
If there is a ball valve present, turn it with the turning handle until the left limit stop in case of a
2/2-way ball valve or until the medium position in case of a 3/2-way ball valve.
Now, the probe is ready for work.
N O T E !
In case the set value indication on the thermostat is adjusted dur-
ing operation in one step for more than 28°C downwards, this ac-
tivates the thermostat’s excess temperature switch off! For
switching on again, the reset button must be actuated.
W A R N I N G !
For works during operation:
High surface temperatures!
Any contact may cause burnings.
Wear protective gloves and protect the probe against unauthor-
ized access!