beautypg.com

Supply connections, Mounting the sample line, Connection of the test gas feeding line – M&C TechGroup SP2000-H320_S2 Operator's manual User Manual

Page 18: Figure 7, Connection tube on gl adapter

background image

18

Gas sampling and gas conditioning technology

2-1.1.4-ME

13

SUPPLY CONNECTIONS

13.1 MOUNTING THE SAMPLE LINE

Open the fastening clip of the sample line.

Unscrew the union nut

of the connecting adapter GL18-DN4/6 and put it together with the

clamping ring

in the correct order and direction over the 6mm PTFE core of the heated

line.

Put the PTFE core on the connection piece

inside the connection adapter and fasten the

union nut with clamping ring hand-tight.

Shut the fastening clip of the sample line.

Figure 7 Connection tube on GL adapter


N O T E !


For probe type SP2000-H320/S.. it is important to use a heated line with ex-
changeable PTFE core only.


13.2 CONNECTION OF THE TEST GAS FEEDING LINE

When using the standard execution or execution with a 3-way ball valve option /3VA320 in the probe
inlet for test gas feeding, an appropriate pipeline has to be connected to the 6mm pipe socket

be-

low the probe housing by means of the attached tube connector. During the measurement, this tube
connector has to be closed with the attached blind cap.


Optionally, a check valve can be mounted in the test gas inlet for thermal decoupling. Also in this
case, an appropriate pipeline has to be connected to the 6mm pipe socket below the probe housing
and by means of the respective tube connector.