RECEIPT OF GOODS AND STORAGE
The gas sample probe and any special accessories should be removed carefully from the packag-
ing and checked immediately for completeness against the delivery note;
Check the goods for any damage incurred during transport and if necessary inform your transport
insurer of any damage.
The gas sample probe is normally delivered in two packaging units:
1. The gas sample probe with the screws, nuts and flange seal required for mounting;
2. Sample tube or pre-filter, if applicable with extension tube.
N O T E !
The equipment should be stored in a protected, frost-free room!
11
PREPARATION AND INSTALLATION
Select the optimal sampling point in accordance with the generally applicable guidelines of
consult the competent persons.