beautypg.com

Paradyne BitStorm IP DSLAM 1900 User Manual

Page 59

background image

2. BitStorm 1900 Installation and Testing

1900-A2-GN20-00

BitStorm 1900 Installation and Maintenance Guide

2-43

Step

Procedure

1.)

Select and apply grounded anti-static protection.

2.)

Select the mounting point in the bay where the top holes of the

shelf mounting flanges will be attached.

3.)

Align the holes of the shelf mounting flanges with the mounting

holes in the bay as shown in Figure 2-5, "BitStorm 1900 Modem
Shelves Mounted in Bay."

WARNING: ELECTROSTATIC DISCHARGE! Anti-static

protection required! The BitStorm 1900
shelves are shipped with the circuit packs
installed. When handling any circuit pack,
you must wear grounded anti-static
protection. The discharge of static electricity
can damage the circuit packs.

!

WARNING: POSSIBLE EQUIPMENT DAMAGE! Installa-

tion Requirement! For a single-shelf
application without a Fan Tray, be sure to
leave at least three inches of space above
and below the BitStorm 1900 shelves to
dissipate heat.