beautypg.com

Installation flowchart – Paradyne BitStorm IP DSLAM 1900 User Manual

Page 50

background image

2. BitStorm 1900 Installation and Testing

2-34

BitStorm 1900 Installation and Maintenance Guide

1900-A2-GN20-00

Installation Flowchart

Figure 2-1, "BitStorm 1900 Installation Flowchart." provides a visual
flowchart of the BitStorm 1900 installation process as a reference tool.

Figure 2-1: BitStorm 1900 Installation Flowchart

Verify

Rack

Space,

Power and

Grounding

Install BitStorm 1900

Chassis directly on top

of Fan Tray or 1 RU

from bottom of rack

Install Fan Tray

(leave 1RU of space

below for proper air flow).

Verify Power Card is

260W.

Are you

Installing an

AC or DC Power

Card

?

Install -48VDC

Power Source

Install Air Baffle

On Top

Are you

using a Filter

Shelf

?

Install

Filter Shelf(s)

on top of BitStorm

1900 Chassis

Install appropriate

cards into the

BitStorm 1900

Verify Power and

Connect to

BitStorm 1900

Install appropriate

Ethernet data

connects to

the MIU

Install Interconnecting

cables to the Filter

Shelf. Refer to

Appendix B for various

configurations

Are you

using a Filter

Shelf

?

Install

Interconnecting

cables to the

BitStorm 1900

Install

Interconnecting

cable to the MDF

Yes

No

Yes

Install Interconnecting

cable between the Filter

Shelf and BitStorm 1900.

Refer to Appendix B for

various configurations

AC

No

Turn Power

On

Install

Rack and

Connect to

Building

Ground

Verify AC Power is

Available

DC

Install

Power

Strip

Install

MIU

Card

Test System

Configure the MIU

and Remote

Management

SNMP

End

Start

02-17173