Task 016: Testing Data Connectivity

This procedure checks data connectivity from the customer premise
distribution frame and the BitStorm 1900 shelf.

Requirements

A StormPort Modem with power adapter and extension cord (if
necessary) is required for this procedure.

Step

Procedure

1.)

Identify the data connections being tested at the EtherLoop cross-

connect block and the Modem card on the BitStorm 1900 shelf.

2.)

Install and connect the modems on the corresponding lines at the

customer premises locations.

3.)

Connect power to the modem.

4.)

Turn on the BitStorm 1900.

5.)

Observe the modem and BitStorm 1900 Modem card LEDs. After

about 4-5 minutes, all LEDs at both the BitStorm 1900 and CPE
locations should be green, with the transfer LEDs flickering.

STOP