Kohler Command Pro CV980 User Manual
Page 75

7.25
Section 7
Electrical System and Components
7
VOM Leads
12 volt Test Leads
Momentary
Connection Only
Solenoid Test Procedure
Solenoid Shift Style Starters
ȱȱȱȱȱȱȱ
ȱȱȱȱĴȱȱȱ ȱȱ
terminal. Remove the mounting hardware and
separate the solenoid from the starter for testing.
Test 1. Solenoid Pull-In Coil/Plunger Actuation
Test.
ȱȱŗŘȱȱ ȱ¢ȱȱ ȱȱǯȱ
ȱȱȱȱȱĚȱȱȃȦȄȱȱ
on the solenoid. Momentarily* connect the other lead
ȱȱ ȱȱȱǯȱȱȱŝȬśŗǯ
ȱȱȱȱȱȱȱȱ
£ȱǻȱǼǰȱȱȱȱǯȱ
Repeat the test several times. If the solenoid fails to
ǰȱȱȱȱǯȱ
Ș:ȱ ȱȱȱȱŗŘȱȱȱȱ
connected to the solenoid for any time
over what is necessary for performing
each of the individual tests. Internal
damage to the solenoid may otherwise
occur.
Figure 7-51. Testing Pull-In Coil/Plunger Actuation.
Test 2. Solenoid Pull-In Coil/Contact Continuity
Test.
ȱȱȱȱȱȱȱȱ¡Ř
ȱǰȱȱ
connect the two ohmmeter leads to the two large post
ǯȱȱȱȱȱǻŗǼȱȱȱ
ȱ¢ǯȱȱȱŝȬśŘǯȱȱȱȱ
indicate continuity, if no continuity is indicated the
ȱȱȱǯȱȱȱȱȱ
ȱęȱǯ
Figure 7-52. Testing Pull-In Coil/Solenoid Contact
Continuity.
Test 3. Solenoid Hold-In Coil Function Test.
ȱȱŗŘȱȱȱȱȱȱĚȱȱȃȦ
start” terminal on the solenoid, and the other lead to
ȱ¢ȱȱȱȱȱȱǯȱǰȱ
manually push the plunger “In” and check if the
ȃȬȄȱȱȱȱȱǯȱȱȱ
ŝȬśřǯȱȱȱ ȱȱȱȱȱȱȱ
to the solenoid for a prolonged period of time. If the
ȱȱȱ¢ȱǰȱȱȱȱȱ
replaced.
12 volt Test Leads
Momentary
Connection Only
Figure 7-53. Testing Hold-In Coil/Function Test.
Manually Push
Plunger "In"
12 volt Test Leads
Connect Only Long
Enough to Test