beautypg.com

Process settings, Process settings -51 – Muratec MFX-2030 User Manual

Page 125

background image

3-51

Using the Admin Tools

1
2
3
4
5
6
7
8
9
10
11
12
13
AI

Using the

Admin

T

ools

Process Settings

You can set the default processing request settings.

NOTE: If the administrator is registered, you should log-in as an administrator to

access this setting.

1

Log-in to “OfficeBridge”.

2

Click [Process Settings] on the “Admin Tools” tab.

The “Processing Request Settings” screen will appear.

Item

Description

“Settings”

Specifies whether to enable use of the “Processing

request” function.

When it is set to “Off”, the “Circulated” tab disappears

and disable the “Circulated Box” function.

This checks whether the “OfficeBridge” request process-

ing function is set to On or Off.

If it is set to “Off”; the “Processing” tab disappears and

the request processing function cannot be used.

“Initial Deadline”

Specifies the number of days, 1 to 30, from the date

on which processing is requested until the end of the

process period.

“Completed and Post-

Deadline Document

Hold Time”

This sets whether or not to automatically delete a docu-

ment for which processing has been completed or whose

processing period has passed.

To not automatically delete, check “Do not Delete Auto-

matically”.

To delete automatically, check “Delete Automatically”

and set the retention period, from 1 to 99 days.

Input single-byte numbers.

The default value is “Do not Delete Automaatically”.

NOTE: The retention period does not include the pres-

ent day. So if you select one day, the document

would be deleted at 12:01 a.m. the day after

tomorrow.