beautypg.com

C.5 fl-net construction work check sheet, Fl-net construction work check sheet, A-18 – Yaskawa JAPMC-MC2303-E User Manual

Page 168

background image

Appendix C FL-net System Grounding

C.5 FL-net Construction Work Check Sheet

A-18

C.5

FL-net Construction Work Check Sheet

The following shows an example of the FL-net construction work check sheet.

Œ

Because the above sheet shows a general-purpose check sheet, it contains some items not applicable to the 262IF-
01.

Check date

Check Item

Company name
Inspector name

Cable

Have you locked all connectors firmly?
Is the bending radius of a cable within the specified value?
Have you protected the connector with a jacket?
Have you affixed a wiring identification number (line number) label?
Is the wiring number correct?
Have you not placed heavy objects on a communication cable?
Have you not bundled a communication cable and a power line together in
the same duct?
Is an AUI cable for repeater within 2 m? Is a transceiver cable within 50 m?
Is a coaxial cable (10BAE5) within 500 m?
Have you connected the coaxial cable to a ground terminal correctly?
Have you insulated the coaxial cable shield and transceiver?
Have you provided the coaxial cable with a terminator correctly?
Is the number of hierarchical repeaters or hub connections correct?
Is the twisted pair cable a straight cable?
Have you employed a twisted pair cable of category 5 and is its length
within 100 m?

Unit

Have you grounded the equipment GND terminal correctly?
Have you tightened each unit to the base firmly?
Have you mounted the base unit at the control panel firmly?
Have you locked the AUI cable firmly?
Have you not exerted excessive force on the mounting part of the AUI
cable from the door?

Hubs,

etc.

Have you connected the RJ45 connector firmly?
Have you locked the AUI cable connector?
Have you affixed a line number label?
Have you located the transceiver at the marked position correctly?
Have you set the transceiver SQE switch properly according to equipment
specifications?
Have you connected the hub firmly?
Have you set the HUB/MAU selector switch of the hub correctly?
Is the hub supply voltage the rated value?

Œ

For equipment alteration, modification, or inspection, be sure to check and make entry.

Œ

Note that the entry field must be given “9” for passed, “

×

” for failed, or “-” for N/A (coaxial cable, twisted pair cable),

and the switch setting field must be given a rotary switch number and a dip switch setting (ON or OFF) if any.

FL-net Construction Work Check Sheet

Communication line name:

Station number: