8.1 Trial Operation
8-15
8
8.1.3 Trial Operation with the Servomotor Connected to the Machine
Follow the procedures below to perform the trial operation.
1. Set the necessary parameters according to the machine configuration.
2. Match the direction of rotation and speed to equipment specifications.
• Follow the procedure below for trial operation precisely as given.
Malfunctions that occur after the servomotor is connected to the machine not only damage the machine, but may also 
cause an accident resulting death or injury.
WARNING
Step
Description
Check Method and Remarks
1
Turn ON the power and make the settings for 
mechanical configuration related to protective func-
tion such as overtravel and brake. 
Refer to 8.3 Setting Common Basic Functions. 
When a servomotor with brake is used, take advance 
measures to prevent vibration due to gravity acting on 
the machine or external forces before checking the 
brake operation. Check that both servomotor and 
brake operations are correct. For details, refer to 8.3.4 
Setting for Holding Brakes.
2
Set the necessary parameters for control mode used. Refer to 8.5 Operating Using Speed Control with Ana-
log Reference, 8.6 Operating Using Position Control, 
and 8.7 Operating Using Torque Control for control 
mode used. 
3
Connect the servomotor to the machine with cou-
pling, etc., while the power is turned OFF.
Refer to 3.3.1 Precautions on Servomotor Installation.
4
Check that the SERVOPACK is servo OFF status 
and then turn ON the power to the machine (host 
controller). Check again that the protective function 
in step 1 operates normally.
Refer to 8.3 Setting Common Basic Functions. 
For steps 4 to 8, take advance measures for emergency 
stop so that the servomotor can stop safely when an 
error occurs during operation.
5
Perform trial operation with the servomotor con-
nected to the machine, following each section in 
8.1.2 Trial Operation for Servomotor without Load 
from Host Reference.
Check that the trial operation is completed with as the 
trial operation for servomotor without load. Also 
check the settings for machine such as reference unit.
6
Check the settings of parameters for control mode 
used set in step 2 again. 
Check that the servomotor rotates matching the 
machine operating specifications. 
To host controller
To power
supply
Secure the motor flange to 
the machine, and install it 
on the load shaft.