Conduit Requirements
General Installation
All wiring and conduit runs must conform to all building/fire codes, all Federal, State, and
Local codes, the National Electrical Code (NFPA 70), NFPA 30, and the Automotive and
Marine Service Stations Code (NFPA 30A). Canadian users must also comply with the
Canadian Electrical Code.
Use the tables below as a guideline to determine the proper conduit sizes for the Gasboy
TopKAT FMS. When planning the orientation of wiring runs, follow the applicable Gasboy
wiring diagram and consider the layout of components at the site. Long runs or a large number
of bends may require you to increase the conduit size over what is listed here.
To determine the conduit size required, use the
table to find the
area for each wire gauge. Add up all wire areas. Use the
table
to select the smallest number in the 25% fill area (based on NEC 501-1) that comes closest
without exceeding the total wire area.
THHN/THWN Wire Areas
Gauge
Diameter
Area (square units)
Inches
Millimeters
Inches
Millimeters
18
.090
2.29
.007
4.1
16
.104
2.64
.009
5.5
14
.118
2.95
.011
6.8
12
.135
3.43
.014
9.2
10
.169
4.29
.022
14.5
8
.216
5.49
.037
23.7
6
.259
6.60
.053
34.2
4
.331
8.41
.086
55.5
3
.359
9.14
.102
65.6
2
.394
10.01
.122
78.7
1063A
.417
10.59
.137
88.4
Areas of Trade Size Conduit
Trade Size
Internal Diameter
Area (square units)
Fill Area (square units) 25% fill
Inches
Millimeters
Inches
Millimeters
Inches
Millimeters
1/2
.629
16
.303
196
.076
49
3/4
.826
21
.532
343
.133
86
1
1.063
27
.862
556
.215
139
1-1/4
1.378
35
1.50
968
.375
242
1-1/2
1.614
41
2.04
1314
.509
329
2
2.087
53
3.36
2165
.839
541