beautypg.com

Port communication wiring – Gasboy TopKAT Fuel Management System Installation User Manual

Page 121

background image

MDE-4319E TopKAT™ Fuel Management System Installation Manual · August 2008

Page 115

Port Communication Wiring

Series 9800 Field Installation

Port Communication Wiring

The following diagrams show the pin-to-pin layout of the possible wiring schemes for the
TopKAT ports. Each port may be wired for any of the wiring schemes, provided the
installation requirements are met as outlined in

“Communication Requirements”

on

page 19

.

Figure 9-4: RS-232 - D Connector

Note: In the TopKAT, the green connector must be connected to P4 on the communication

board for Port 2, and P6 for Port 3. The K1 and K2 jumper for the port being used
should be set to RS-232. Refer to

“Terminal Block ID”

on

page 24

for the location of K1

and K2 jumpers.

This manual is related to the following products: