12 – Testing

Completion Check List

The information below will help verify if the TopKAT system is properly installed. Review it
before testing the pumps and/or dispensers in the manual override position.

• Is the optional data terminal located in a clean, office-type environment?
• Is the optional external modem located in an office-type environment or a protective

enclosure?

• Is all the wiring in metal conduit? (refer to

“Conduit Requirements”

on

page 14

). The only

exception to the metal conduit rule is RS-422 as noted in

“RS-422 - SHMs”

on

page 22

.

• Is the AC and DC wiring in separate conduits, troughs, and so on - except as noted in

“RS-422 - SHMs”

on

page 22

?

• Is the system/peripheral equipment on a separate dedicated breaker? (refer to

“Power

Requirements”

on

page 16

).

• Is the system grounded properly? (refer to

“Power Requirements”

on

page 16

).

• Is the correct gauge wire installed for the communication lines? (

“Wire Size”

on

page 17

)

• Are the communication lines under the maximum allowable distance?

- RS-232: 100 feet
- RS-422: 1500 feet except as noted in

“RS-422 - SHMs”

on

page 22

.

• If the system has an internal modem, is the phone line installed? (

“Internal Modem”

on

page 13

)