Completion Check List
Testing
12 – Testing
Completion Check List
The information below will help verify if the TopKAT system is properly installed. Review it
before testing the pumps and/or dispensers in the manual override position.
• Is the optional data terminal located in a clean, office-type environment?
• Is the optional external modem located in an office-type environment or a protective
enclosure?
• Is all the wiring in metal conduit? (refer to
). The only
exception to the metal conduit rule is RS-422 as noted in
on
• Is the AC and DC wiring in separate conduits, troughs, and so on - except as noted in
on
• Is the system/peripheral equipment on a separate dedicated breaker? (refer to
on
• Is the system grounded properly? (refer to
on
• Is the correct gauge wire installed for the communication lines? (
on
• Are the communication lines under the maximum allowable distance?
- RS-232: 100 feet
- RS-422: 1500 feet except as noted in
on
.
• If the system has an internal modem, is the phone line installed? (
on
)