Testing

Manual Override Test - 4-hose Mechanical PCU Option

Page 128

MDE-4319E TopKAT™ Fuel Management System Installation Manual · August 2008

7

Turn off all hoses.

8

Place the system override switches for hose 1 in the ON position.

9

Repeat steps

4

through

8

for all remaining hoses. Substitute the hose under test for hose 1.

10

Turn off the AC power and battery power switches in the PCU.

11

Turn off the breakers for all the pumps and/or remote dispensers and the TopKAT system and
other components.

12

Replace all wiring connectors (green) removed in step

1

from the Pump Control I/O PCB

assembly.

Note: The manual override test will uncover most point-to-point AC wiring mistakes that can

occur. The automatic test performed during the system start-up will complete the
verification of correct AC wiring to the pimp/remote dispensers. The automatic test
should only be performed at start-up.