Main Harmonics Test Window



Upon closing the Main setup window,
and test results are displayed in real-time.
function of which are explained in the

Field / Control

Location

Start button

Upper left
corner

MX-CTSL

Revision J

Window Operation

Figure 5-5: Harmonics Test Window

the harmonics test window will appear. Tests are

time. This main harmonics test window has a limited

table below.

Description

Starts harmonics test using presently selected parameters.
is running, parameters cannot be changed. Starting a
data to be written to the test data file if data recorded
time a test is run, a new sequential 'Test Number' is assigned.
for each test are automatically logged. Data for each
recorded if this option is selected in the Additional Setup
Once a test is running, the Start button changes to a
any menus will be disabled while a test is in progress
menu under Windows will cause the application to halt
result in data loss.

CTSL Compliance Test System

74

are executed from this window

limited number of controls, the

parameters. Once a test

a test also causes

recorded is enabled. Each

assigned. Results

each test is only

Setup screen.

a Stop button. Also,

progress as pulling down a

halt which would