Configuring tasks listed on list of selected tasks – Xtramus APMPT-4 V2.4 User Manual
Page 49
49
E-mail: [email protected]
Website: www. Xtramus.com
XTRAMUS TECHNOLOGIES
®
4.2.3. Configuring Tasks Listed on List of Selected Tasks
After choosing the tasks you would like to perform from Built-in Tasks
as mentioned in “4.2.2. Task List
Setting
”, you can start making detail settings with individual tasks by clicking the task you would like to
configure from List of Selected Tasks. All the configurations for this task will be listed in the right-side
section as shown in the figure down below.
Please note that the maximum number of tasks that can be selected into the List of Selected Tasks is
32.
As mentioned in
“4.2.2. Task List Setting, B. Built-in Tasks & C. Task Group Selection”, all tasks
available for APMPT-4 can be divided into different groups Layer 1, Layer 2, Layer 3, PoE (Power over
Ethernet), AC (DUT Power Test), Terminal, General and Customization.
For more detailed information regarding to task settings in APMPT-
4‟s task groups, please refer to “5.
APMPT-4 Detail Task Setting
.”
You can use the three buttons to save the settings.
Save:
Click this button, a “Save As” window as below will pop up and prompt you to save all the
configurations you made.
‟