beautypg.com

Configuring tasks listed on list of selected tasks – Xtramus APMPT-4 V2.4 User Manual

Page 49

background image


49

E-mail: [email protected]

Website: www. Xtramus.com

XTRAMUS TECHNOLOGIES

®

4.2.3. Configuring Tasks Listed on List of Selected Tasks

After choosing the tasks you would like to perform from Built-in Tasks

as mentioned in “4.2.2. Task List

Setting

”, you can start making detail settings with individual tasks by clicking the task you would like to

configure from List of Selected Tasks. All the configurations for this task will be listed in the right-side

section as shown in the figure down below.

Please note that the maximum number of tasks that can be selected into the List of Selected Tasks is

32.

As mentioned in

4.2.2. Task List Setting, B. Built-in Tasks & C. Task Group Selection”, all tasks

available for APMPT-4 can be divided into different groups Layer 1, Layer 2, Layer 3, PoE (Power over

Ethernet), AC (DUT Power Test), Terminal, General and Customization.

For more detailed information regarding to task settings in APMPT-

4‟s task groups, please refer to “5.

APMPT-4 Detail Task Setting

.”

You can use the three buttons to save the settings.

Save:

Click this button, a “Save As” window as below will pop up and prompt you to save all the

configurations you made.