beautypg.com

Test task – ac, Pwr-setup (power setup test), Test task – Xtramus APMPT-4 V2.4 User Manual

Page 101

background image


101

E-mail: [email protected]

Website: www. Xtramus.com

XTRAMUS TECHNOLOGIES

®

5.5. Test Task

– AC

Test Task

– AC allows you to test DUT‟s power supply. For more detail description regarding to Test

Task

– AC, please refer to “1.3.5. AC Test”. Please note that if you don‟t have XM-2WL1 module card

installed on your chassis, you can‟t run tasks mentioned here.

5.5.1. PWR-Setup (Power Setup Test)

With module card XM-2WL1 providing power to the DUT, you can perform power ON/OFF and cycling

tests with PWR-Setup.

Setup

Power Control: To turn the power of DUT ON or OFF.

Zero/Peak Cross: In a Voltage vs. Time diagram shown on the

right, a Zero Cross happens every time when the value of

voltage reaches zero. Zero-crossing is the key to determining

the proper switching time (phase angle) in both leading edge

and trailing edge dimmers. You can set the crossing mode to 0

to 270 degrees here, or you can set the crossing mode to

Free-run mode.

Cycle Setting: By click the Enable Cycle Reboot check-box, you can perform power on/off

cycling tests.

Initial/End: You can set the starting/ending power status to ON/OFF here in these fields.

Count: You can set how many times you would like to run the power on/off cycling test.

Interval: You can set the amount of seconds system shall wait between each cycling test.

Wait before Power ON/OFF: System will halt for the set amount of seconds before power on/off.

Wait after Power ON/OFF: System will halt for the set amount of seconds after power on/off.