beautypg.com

Installation and operation, Figure 4-1 atca-n700 – ADLINK aTCA-N700 User Manual

Page 16

background image

aTCA-N700 HW Users Guide

16

4. Installation and Operation







Before installing the ATCA-N700, make sure that the following are ready or checked to
insure proper installation and operation:

• An ATCA chassis with a reserved slot for the aTCA-N700.
• A console PC that runs a serial port monitoring or terminal emulation program
• Software: All the necessary software and firmware are programmed into the

EEPROM/flash memories upon delivery of the board



Figure 4-1 aTCA-N700