beautypg.com

1 maintenance schedule, Monthly, Semi-annually – Reznor MAPS - A,B,C Users Manual User Manual

Page 4: Annually, 0 maintenance requirements (cont'd)

background image

Form O-MAPSIII&IV Cabinets A/B/C, Page 4

2.1 Maintenance

Schedule

Monthly

Inspect filters; clean or replace as needed. See Paragraph 3.1.

Inspect the condensate drain; clean as needed. For information, see the

installation manual, Form I-MAPSIII&IV, Paragraph 6.2.

Semi-Annually

Inspect the unit blower and belts. Check belts for tension, wear, and alignment.

Adjust or replace as needed. Clean dirt from blower and motor. See Paragraph

3.2.

Annually

NOTE: Redo the cooling startup procedures when the cooling season begins. Refer

to Startup instructions in the installation manual, Form I-MAPSIII&IV, Paragraph 10.0.

All Models - Beginning of the cooling season or more frequently

in year-round cooling climate:

Inspect the wiring for any damaged wire. Replace damaged wiring.

Inspect the condensate drain pan. Clean the coil cabinet, clean the drain pan,

and fill the trap.

Inspect/clean condenser fans. See Paragraph 3.3.

Inspect/clean all coils. See Paragraph 3.4.

Check compressor operation. See Paragraph 3.6.

Check refrigerant pressure and temperatures (superheat and subcool). These

checks are done when the system is operating. See Paragraph 3.5.

Models RDCB, RDCC, RDDB, & RDDC with a gas heat section

(beginning of the heating season) - See Paragraph 4.0:

NOTE: A MAPS

®

B cabinet with 500 MBH of heat is a Size 250 gas heat section

plus an optional Model JHUP curb duct furnace. A MAPS

®

C cabinet with 1000

MBH of heat is a Size 700 gas heat section plus an optional Model JHUP curb duct

furnace. The same maintenance procedures apply to the duct furnaces.

Clean all dirt and grease from the combustion air openings and the venter

assembly.

Check the heat exchanger, burner, and venter for scale, dust, or lint

accumulation. Clean as needed.

Check the gas valves to ensure that gas flow is being shutoff completely.

Models RECB, RECC, REDB, & REDC with an electric heat section

(beginning of the heating season) - See Paragraph 5.0:

Check wiring connections.

Check the heat section and elements for dust or lint accumulation. Carefully

clean as needed.

2.0 Maintenance

Requirements

(cont'd)

Important NOTE:

If equipped with an

optional energy recovery

module, refer to Form

I-MAPSIII&IV-ER

for enthalpy wheel

maintenance instructions