7.8 SHUTTING THE BOILER DOWN FOR AN EXTENDED PERIOD OF TIME

If the boiler is to be taken out of service for an extended period of time (one year or more), the
following instructions must be followed.

1. Set ON/OFF switch on the front panel to the OFF position to shut down the boiler’s

operating controls.

2. Disconnect AC power from the unit.

3. Close the water supply and return valves to isolate boiler.

4. Close external gas supply valve.

5. Open relief valve to vent water pressure.

7.9 PLACING THE BOILER BACK IN SERVICE AFTER A PROLONGED
SHUTDOWN

After a prolonged shutdown (one year or more), the following procedures must be followed:

1. Review installation requirements included in Chapter 2.

2. Inspect all piping and connections to the unit.

3. Inspect exhaust vent, air duct (if applicable).

4. Perform initial startup per Chapter 4.

5. Perform safety device testing and scheduled maintenance procedures per Chapters 6 and 7

of this manual.