CHAPTER 7. MAINTENANCE

7.1 MAINTENANCE SCHEDULE

The unit requires regular routine maintenance to keep up efficiency and reliability. For best
operation and life of the unit, the following routine maintenance procedures should be performed
in the time periods specified in Table 7-1. See Appendix I for a complete CSD-1 inspection
check list.

In order to perform the maintenance tasks specified in Table 7-1, the following maintenance kits
are available through your local AERCO Sales Representative:

• Annual Maintenance Kit, Part No. 58025-01
• 24-Month Waterside/Fireside Inspection Kit, Part No. 58025-06 (See NOTE below)

NOTE

The 24-Month Waterside/Fireside Inspection Kit also includes the items
contained in the Annual Maintenance Kit. Therefore, only Kit Part No.
58025-06 is required when performing the waterside/fireside inspections.

Appendix K contains recommended spare parts lists for maintenance of the boiler.

WARNING

TO AVOID PERSONAL INJURY, PRIOR TO SERVICING ENSURE THAT
THE FOLLOWING GUIDELINES ARE STRICTLY OBSERVED:

• DISCONNECT THE AC SUPPLY BY TURNING OFF THE

SERVICE SWITCH AND AC SUPPLY CIRCUIT BREAKER.

• SHUT OFF THE GAS SUPPLY AT THE MANUAL SHUT-

OFF VALVE PROVIDED WITH THE UNIT

• ALLOW THE UNIT TO COOL TO A SAFE WATER

TEMPERATURE TO PREVENT BURNING OR SCALDING

Table 7-1: Maintenance Schedule

Paragraph

Item

6 Mos.

12 Mos.

24 Mos.

Labor

Time

7.2

Igniter-Injector

(58023)

*Inspect

Inspect

Replace

15 mins.

7.3

Flame Detector

(66006)

*Inspect

Inspect

Replace

15 mins.

7.4

Combustion Calibration &

RSI Regulator Adjustment

*Check

Check

-

1 hr.

7.5

Testing of Safety Devices

-

See CSD-1

Chart in

Appendix I

-

20 mins.

7.6

Burner

-

-

Inspect

2 hrs.

7.7

Condensate Drain Trap

*Inspect

Inspect &

Clean

-

30 mins.

*Only performed after initial 6 month period after initial startup.