Creating the ladder program, Creating the ladder program -19 – KEYENCE LK-CC100/DN100 User Manual
Page 33

2-19
2
2 Connecting to CC-Link
Creating the Ladder Program
Acquiring measurement data, tolerance comparator results, various
statuses (auto-zero, timing, system error), and program number settings
Create the ladder program as follows.
1
Check the status.
Verify the SYSTEM_ERR_FLAG is OFF and READY_FLAG is ON.
2
Store the counter value.
Store the current counter value (COUNTER_LO and COUNTER_HI).
3
Check for counter value updates.
Wait until the current counter value, stored in Step 2, changes.
4
Acquire data.
Acquire the required data.
The counter value will be updated twice after any of the following has happened to the controller: start
up, set, an able tuning performed, a set scaling from a measurement data, or a complete
communication has been performed
NOTE
- LR-TB2000 Series (12 pages)
- LR-TB5000 Series (12 pages)
- LR-ZB250AN/AP (4 pages)
- LR-ZB250AN/P (3 pages)
- LR-ZBxN/P Series (3 pages)
- LR-ZBxxB (3 pages)
- OP-85135 (1 page)
- PZ-G Series (2 pages)
- PZ-V/M (2 pages)
- PS-N10 Series (12 pages)
- PX-10 (10 pages)
- CZ-V21A(P) (10 pages)
- CZ-K1(P) (8 pages)
- CZ-V1 (8 pages)
- FS-N10 Series (6 pages)
- FS-N10 Series (116 pages)
- FS-N15CN (1 page)
- FU-93(Z) (2 pages)
- FU-V Series (2 pages)
- FS-V30 (6 pages)
- FU-A40 (1 page)
- NU/FS-N Series (16 pages)
- FS-V33(P) (8 pages)
- FS-V21 (4 pages)
- FS-V22 (4 pages)
- FS-V11(P) (4 pages)
- FS-V1(P) (4 pages)
- LV-N10 Series (12 pages)
- LV-N10 Series (112 pages)
- LV-S62 (1 page)
- OP-84350 (1 page)
- LV-SA (10 pages)
- LV-SB (12 pages)
- OP-87305 (1 page)
- LV Series (10 pages)
- LV-B102 (1 page)
- EV-108M(U) (1 page)
- EZ Series (1 page)
- EM Series (1 page)
- ES-M1(P) (3 pages)
- EX-V Series (120 pages)
- EX-500(W) Series (16 pages)
- GV Series (10 pages)
- IA Series (8 pages)
- LB-1000(W) (24 pages)