beautypg.com

Poly bed 4 x 2 drive system – Cub Cadet 4 x 2 Big Country - Poly Bed & Steel Bed User Manual

Page 26

background image

Poly Bed 4 X 2 Drive System

22

6.13. Remove and discard the cotter pins securing the

clevis pins into each brake cable clevis/actuator
arm connection. Remove the clevis pins.
See Figure 6.13.

6.14. Disconnect the red wire with white trace from the

neutral switch, located on the rear surface of the
upper portion of the transaxle housing. The nut
that secures the eyelet to the stud can be
removed using a 7 mm wrench.

6.15. Remove the bolt holding the front of the tran-

saxle to the torque bracket using two 9/16”
wrenches. See Figure 6.15.

6.16. Remove the bolts that fasten the spring mounts

to the engine and transaxle cradle using a pair of
1/2” combination wrenches. See Figure 6.16.

NOTE: On each side of the cradle there are two
pedestals: one in front of the axle tube, and one
behind. Two bolts fasten each pedestal to the
front or rear of a spring mount.

6.17. Install the drain and fill plugs, remove the drain

pan and lower the bed.

6.18. Lift and safely support the rear of the vehicle.

See Figure 6.18.

NOTE: Lift the vehicle by the rear cross-member
of the engine and transaxle cradle.

Figure 6.13

Cotter
pin


Clevis pin

Clevis

Figure 6.15

Torque bracket

Figure 6.16

Spring mount
bolts and nuts

Figure 6.18