MacDon D60 Draper Headers User Manual
Page 137

SECTION 8. MAINTENANCE AND SERVICING
Form 169441
135
Revision B
3. Slide tine tube to expose bushing. Remove
bushing halves (H).
8.9.13.2 Bushing Installation - 6 and 9 Bat Pick-
Up Reels
IMPORTANT
Ensure tine tube is supported at all
times to prevent damage to the tube or
other components.
a. At cam end, position bushing halves (H) on tine
tube so that lug in each bushing half locates in
hole in tine tube.
b. Slide tine tube to the left side of header to locate
bushings in reel arm.
c. At the center and left side disc, position bushing
halves (D) on tine tube so that lug in each
bushing half locates in hole in tine tube.
d. Slide reel arm (B) onto bushing, and position
against disc at original location.
e. Install bolts (A) in original holes, and tighten.
f.
Re-install any fingers or tines that were removed.
g. Install bushing clamps as follows:
1. Spread clamp (C), and slip over tine tube
adjacent to flangeless end (J) of bushing.
2. Locate clamp on bushings (D) so that edges
of clamp and bushing are flush when clamp
fits into groove on bushing, and lock tabs are
engaged.
3. Tighten clamp with modified channel lock
pliers (K), so that finger pressure will not
move clamp.
IMPORTANT
Over tightening clamp may result in
breakage.
B
A
D
D
C
J
H
H
K
C