Installation
Installation
74
75
DANGER
Danger to life due to dangerous electrical voltage!
Risk of serious injury.
Electrical residual energy remains in lines, equipment and devices after
shutting down the device.
Point out the power sockets to the operating personnel. Disconnect
the power plugs from the energy source in order to establish zero
potential.
Only allow qualified electricians to perform work on the electrical
supply system.
Disconnect the device from the mains supply. Regularly check the
electrical equipment (power cords) of the device.
Replace damaged power cords. Examine all mains cables for
damages at regular intervals as part of the repair and preventive
maintenance work.
Only set up or disconnect connections when disconnected from the
power supply.
Powerbox, multiple socket and control box
Connection principle
See chapter entitled „Function and connection principle” - Hei-VAP
Industrial Distimatic”- „Connection principle of power supply”.
Powerbox for Hei-VAP Industrial or powerbox for chiller:
Ensure that a suitable series fuse is connected in the in-house system. There is no
integrated fuse in the powerbox.
Route the power cord for the Hei-VAP Industrial / chiller through the cable feed (32).
a. On variant 3 x 400 V – 230 V (standard):
Connect PE cables (33), L1 (34), L2 (35), L3 (36), N (37) to connections (33) through
(37).
Fit a mains plug to suit the region on the mains supply cable (31) and connect to
mains socket. You can also attach the power supply cable (31) directly to the building
electrical installation.
Secure powerbox power cord in connection (38).
Multiple socket:
Connect powerboxes and residue pump (only on Distimatic including automatic
drainage of residue) to connections (45) in the multiple socket
(total output = 3500 W).
b. On Variant 1 x 230 V – 230 V:
Connect PE cables (33), L1 (34), N (39) to connections (33), (34) and (39).